Pearl Harbor Memorial Bridge

WHAT WE DID

The 1958 Pearl Harbor Memorial Bridge was replaced by a modern 10-lane version.

ABOUT THIS PROJECT

Replaced the 1958 Pearl Harbor Memorial Bridge with a modern $554 million, 10-lane version by the Connecticut Department of Transportation . Provided erection engineering for bridge steel of the I-95 west approach, addressing the challenges of a coastal work site with high design construction wind speeds, curved steel girders with truncations, and temporary bearing requirements caused by cold weather erection.

This project was completed as Ruby + Associates prior to November 2023. The project experience is included to represent the breadth of expertise of Degenkolb Engineers in the Midwest region.

Staff on the Project

Thad Greiner
Principal
John Matuska
Senior Principal, Practice Area Leader