Cobo Conference & Exhibition Center

WHAT WE DID

Finding the optimal location for over 400,000 pounds of equipment and counterweight in downtown Detroit.

ABOUT THIS PROJECT

The Detroit Regional Convention Facility Authority is completing a $270 million reinvention at this center. Degenkolb provided stability analyses and erection procedures for the renovation of Oakland Hall Annex, and connection design of the reframed floor system. A key challenge involved finding the optimal location for a 159,000 pound crane and 249,000 pounds of counterweight, without overloading the structure beneath. Degenkolb then provided lift assistance for a 180 foot box truss weighing 110 tons for the new Ballroom, and stability analysis and erection procedure in the new Atrium for installation of 60 foot transfer trusses and removal of building columns.

Staff on the Project

Jeff Gasparott
Principal, Regional Practice Area Leader
Matthew Smith
Associate Principal
Quentin Greiner
Associate
Todd Lackey
Associate Principal
Neil Sheedy
Senior BIM Specialist
Paolo DeGiuli
BIM Manager

INDUSTRY PARTNERS

MSIRobot