C5 Hangar Installations

WHAT WE DID

Eliminating the need for shoring with a two-crane tandem lift system.

ABOUT THIS PROJECT

The Tennessee Air National Guard was constructing two side-by-side hangars simultaneously. Working with the erector, our team eliminated the need for shoring using a two-crane tandem lift system and minimized temporary bracing requirements by designing one set of reusable stability struts for both facilities. We also assisted the construction manager during pre-construction.

This project was completed as Ruby + Associates prior to November 2023. The project experience is included to represent the breadth of expertise of Degenkolb Engineers in the Midwest region.