Designed a 125,000-sf conveyor mezzanine to support a new million-square-foot body shop. The full-service scope included checked plate and screenguard modules for six conveyor systems, three 19-ft robot towers, a dozen stairs, and support and fall-protection rails for ten lifters. We coordinated closely with other trades to simplify fire protection piping installation under the mezzanine, managing 72,000-sf of checked plate, 55,000-sf of screenguard, 7,000 drawings, 3,200 assemblies, and 2.3-million pounds of steel suspended from building trusses. Our team delivered a fully coordinated, efficient mezzanine that ensures both operational performance and safety.
This project was completed as Ruby + Associates prior to November 2023. The project experience is included to represent the breadth of expertise of Degenkolb Engineers in the Midwest region.