At the Anna Scripps Whitcomb Conservatory on Belle Isle, the team supported Ideal Contracting with the renovation of the structural framing for the historic Palm House. The team provided temporary works design and structural engineering services to safely remove and replace sixteen existing lattice columns while maintaining the stability of the surrounding framing. The team developed shoring and erection plans, construction wind loading criteria, and coordinated closely with site conditions to ensure stability throughout the replacement process.