Del Campo High School, CTE Building, Renovation and Reuse

WHAT WE DID

San Juan USD, Del Campo High School, CTE Building, Renovation and Reuse, Fair Oaks, CA

ABOUT THIS PROJECT

A previously utilized vocational building has been repurposed to accommodate highly sought-after career technical education programs, such as Fire/EMT, Computer Technology, and Television Broadcast. The $10 million, 12,000 square-foot modernized CTE building introduces innovative areas, including a new fire training bays to house a fire truck and ambulance, a classroom and apparatus bay, a broadcast studio with a classroom and control room, a fabrication lab, and a computer technology center. The project costs required a full building retrofit which was collaboratively developed with XL construction for schedule and cost considerations.

Features:

  • Progressive Design-Build Delivery
  • K-12 Education
  • Rehabilitation

Staff on the Project

a man smiling for the camera
Jason Scanlan
Principal
Cata Doughri
Project Accountant
George Guevarra
Senior BIM Specialist
Laura Rice
Associate Principal
Wesley Chan
Design Engineer

MSIRobot