a fire hydrant in front of a building

University of California Davis, Bioseed Technology Laboratory (Genome Launch)

Degenkolb designed 21,000 square foot laboratory building to initially house the new Genomics faculty. The building was later converted to a bioseed facility. The facility houses labs, computer rooms, and offices. The one-story structure is steel framed with exterior masonry walls and steel braced frames.

Project Stats
Client SmithGroup, University of California,
Square Footage 21,000
Construction Cost $17M
Back To All Projects

MSIRobot