Stanford Hospital, South Bay Cancer Center
Degenkolb designed the $23 million tenant improvements to complete 74,800 square feet of a cancer treatment center.
a machine in a room
California Pacific Medical Center, Van Ness and Geary Medical Center
The team scheduled, quantified, analyzed, and documented the design in real time, reducing waste.
a city with tall buildings
James Rutter Middle School, Science Building, New Design
Designed a new science classroom center on the campus of the James Rutter Middle School in Sacramento.

New Design

For every new building, our goal is to provide our clients with an efficient design while not compromising quality. One method we have found that fosters this is fast-track project scheduling, which reduces project schedules and saves construction cost. Through structural technologies such as sustainable and performance-based design, Degenkolb can produce a design that is more efficiently constructable while ensuring maximum seismic safety on the building.

All Services

MSIRobot