Department of Veterans Affairs, Las Vegas Medical Center
The design of the Center Utility Plant allows the facility to function an additional 10 days on its own without utility resources.
a long shot of a building
Department of Veterans Affairs, Loma Linda Community Based Outpatient Clinics
This facility was delivered as a private-public partnership (P3), a first for the VA.
a building with a fountain in front
Los Angeles Valley College, Allied Health/Science Center
The LEED Gold facility includes research laboratories and offices, analytical facilities, classrooms, and informal academic spaces.
a group of people sitting on a bench in a large room with a glass ceiling and a large

New Design

For every new building, our goal is to provide our clients with an efficient design while not compromising quality. One method we have found that fosters this is fast-track project scheduling, which reduces project schedules and saves construction cost. Through structural technologies such as sustainable and performance-based design, Degenkolb can produce a design that is more efficiently constructable while ensuring maximum seismic safety on the building.

All Services

MSIRobot