a construction site with cranes

Washington State Convention Center, On-Call GC Services, Seattle, WA

WHAT WE DID

Degenkolb has provided the general contractor with a multitude of Construction Engineering services including excavation shoring bridging documents, temporary bracing of concrete walls, design of temporary structures and platforms, validation of partial excavation/ construction sequences, and peer review of the erection stability plan.

ABOUT THIS PROJECT

The Washington State Convention Center Additional (WSCCA) is a transformative project for the City of Seattle and will increase the current center’s space by more than one million square feet. Since 2016, Degenkolb has provided the general contractor with a multitude of Construction Engineering services including excavation shoring bridging documents, temporary bracing of concrete walls, design of temporary structures and platforms, validation of partial excavation/ construction sequences, and peer review of the erection stability plan.

Staff on the Project

Cale Ash
Principal, Group Director
Josh Sizemore
Senior Engineer
David Sommer
Associate Principal
Jacci Rock
Design Engineer

MSIRobot