Maximizing shop efficiencies for a 650,000-square-foot manufacturing plant.

ABOUT THIS PROJECT

LG Chem and its U.S. subsidiary, Compact Power Inc. (CPI), constructed a $303 million, 650,000-square-foot manufacturing plant with the capacity to produce enough battery cells for 50,000 to 200,000 vehicle battery packs. Ruby worked closely with Bristol Steel and provided structural steel connection design, stability analysis during construction, and a constructability-based redesign of the structural elements to maximize shop efficiencies.