Kaiser Permanente, Specialty Medical Office Building
This project allowed for design outside of OSHPD standard codes, lowering costs of building systems and reducing the time inherent in the OSHPD approval process.
Kaiser Permanente Specialty Office Building
Solyndra Manufacturing Facility
In less than 10 months, both the design and construction of the facility were complete.
Solyndra Solar Plant
North Elementary School, New Classroom Building

New Design

For every new building, our goal is to provide our clients with an efficient design while not compromising quality. One method we have found that fosters this is fast-track project scheduling, which reduces project schedules and saves construction cost. Through structural technologies such as sustainable and performance-based design, Degenkolb can produce a design that is more efficiently constructable while ensuring maximum seismic safety on the building.

All Services

MSIRobot