City of Ocean Shores Tsunami Evacuation Tower, Ocean Shores, Washington
a person riding a bicycle on a road with an observation tower with many stairs
Kaiser Permanente, Oakland Main Hospital
The project achieved about $50 million escalation cost savings by using an incremental review process during design.
Kaiser Permanente Oakland Replacement Hospital, Main Hospital
Portland State University, Science Research & Teaching Center (SRTC)
To minimize disruption to the student occupants and symbolize the building’s modernization, innovative exterior strengthening schemes were developed and utilized.
Portland State University, SRTC Building

New Design

For every new building, our goal is to provide our clients with an efficient design while not compromising quality. One method we have found that fosters this is fast-track project scheduling, which reduces project schedules and saves construction cost. Through structural technologies such as sustainable and performance-based design, Degenkolb can produce a design that is more efficiently constructable while ensuring maximum seismic safety on the building.

All Services

MSIRobot