Project JOE at Cowan Elementary and Greer Elementary School
Project JOE included districtwide modernizations for San Juan USD. Our work was focused on the new design and modernizations at Cowan Elementary and Greer Elementary School.
a building with a pool
California Pacific Medical Center, Van Ness and Geary Medical Center
The team scheduled, quantified, analyzed, and documented the design in real time, reducing waste.
a city with tall buildings
Department of Veterans Affairs, Loma Linda Community Based Outpatient Clinics
This facility was delivered as a private-public partnership (P3), a first for the VA.
a building with a fountain in front

New Design

For every new building, our goal is to provide our clients with an efficient design while not compromising quality. One method we have found that fosters this is fast-track project scheduling, which reduces project schedules and saves construction cost. Through structural technologies such as sustainable and performance-based design, Degenkolb can produce a design that is more efficiently constructable while ensuring maximum seismic safety on the building.

All Services

MSIRobot