Stanford University, Hoover Institute, David and Joan Traitel Building
The building features a 400-seat Hauck Auditorium and Blount Hall, a dining-multipurpose room for 400.
a room with couches and a table
Department of Veterans Affairs, Las Vegas Medical Center
The design of the Center Utility Plant allows the facility to function an additional 10 days on its own without utility resources.
a long shot of a building
Dignity Health, Northridge Diagnostic and Treatment Medical Center
Degenkolb led a multi-disciplinary team of consultants for the seismic upgrade of this 70,000 square-foot earthquake-damaged, two-story, welded steel moment frame building.
a room with equipment and equipment

New Design

For every new building, our goal is to provide our clients with an efficient design while not compromising quality. One method we have found that fosters this is fast-track project scheduling, which reduces project schedules and saves construction cost. Through structural technologies such as sustainable and performance-based design, Degenkolb can produce a design that is more efficiently constructable while ensuring maximum seismic safety on the building.

All Services

MSIRobot