Stanford Hospital, South Bay Cancer Center
Degenkolb designed the $23 million tenant improvements to complete 74,800 square feet of a cancer treatment center.
a machine in a room
Kaiser Permanente, Oakland Main Hospital
The project achieved about $50 million escalation cost savings by using an incremental review process during design.
Kaiser Permanente Oakland Replacement Hospital, Main Hospital
Alta Bates Summit Medical Center, Merritt Tower
The project was delivered with LEAN design practices, including extensive validation and planning phase.
an office with a desk and chairs

New Design

For every new building, our goal is to provide our clients with an efficient design while not compromising quality. One method we have found that fosters this is fast-track project scheduling, which reduces project schedules and saves construction cost. Through structural technologies such as sustainable and performance-based design, Degenkolb can produce a design that is more efficiently constructable while ensuring maximum seismic safety on the building.

All Services

MSIRobot