Department of Veterans Affairs, Las Vegas Medical Center
The design of the Center Utility Plant allows the facility to function an additional 10 days on its own without utility resources.
a long shot of a building
Del Campo High School, Science and Media Commons Building, New Design
Loma Linda University, Medical Center, Central Plant SPC4D/NPC-5 4 Upgrades
Degenkolb was prime consultant for the SPC4D / NPC4 seismic upgrade of the 1964 steam plant, which serves Loma Linda Medical Center and Loma Linda University.
Loma Linda University, Medical Center, Central Plant SPC4D/NPC-4 Upgrades

New Design

For every new building, our goal is to provide our clients with an efficient design while not compromising quality. One method we have found that fosters this is fast-track project scheduling, which reduces project schedules and saves construction cost. Through structural technologies such as sustainable and performance-based design, Degenkolb can produce a design that is more efficiently constructable while ensuring maximum seismic safety on the building.

All Services

MSIRobot