California Pacific Medical Center, Mission Bernal Campus Replacement Hospital
a building with people walking around
Alta Bates Summit Medical Center, Merritt Tower
The project was delivered with LEAN design practices, including extensive validation and planning phase.
an office with a desk and chairs
Department of Veterans Affairs, Loma Linda Community Based Outpatient Clinics
This facility was delivered as a private-public partnership (P3), a first for the VA.
a building with a fountain in front

New Design

For every new building, our goal is to provide our clients with an efficient design while not compromising quality. One method we have found that fosters this is fast-track project scheduling, which reduces project schedules and saves construction cost. Through structural technologies such as sustainable and performance-based design, Degenkolb can produce a design that is more efficiently constructable while ensuring maximum seismic safety on the building.

All Services

MSIRobot