Solyndra Manufacturing Facility
In less than 10 months, both the design and construction of the facility were complete.
Solyndra Solar Plant
Los Angeles Valley College, Allied Health/Science Center
The LEED Gold facility includes research laboratories and offices, analytical facilities, classrooms, and informal academic spaces.
a group of people sitting on a bench in a large room with a glass ceiling and a large
Department of Veterans Affairs, Seattle Mental Health Facility and Parking Garage
The VA envisioned a new mental health and research building.
a large building with many windows

New Design

For every new building, our goal is to provide our clients with an efficient design while not compromising quality. One method we have found that fosters this is fast-track project scheduling, which reduces project schedules and saves construction cost. Through structural technologies such as sustainable and performance-based design, Degenkolb can produce a design that is more efficiently constructable while ensuring maximum seismic safety on the building.

All Services

MSIRobot