Kaiser Permanente, Oakland Main Hospital
The project achieved about $50 million escalation cost savings by using an incremental review process during design.
Kaiser Permanente Oakland Replacement Hospital, Main Hospital
Department of Veterans Affairs, Seattle Mental Health Facility and Parking Garage
The VA envisioned a new mental health and research building.
a large building with many windows
Solyndra Manufacturing Facility
In less than 10 months, both the design and construction of the facility were complete.
Solyndra Solar Plant

New Design

For every new building, our goal is to provide our clients with an efficient design while not compromising quality. One method we have found that fosters this is fast-track project scheduling, which reduces project schedules and saves construction cost. Through structural technologies such as sustainable and performance-based design, Degenkolb can produce a design that is more efficiently constructable while ensuring maximum seismic safety on the building.

All Services

MSIRobot