Department of Veterans Affairs, Loma Linda Community Based Outpatient Clinics
This facility was delivered as a private-public partnership (P3), a first for the VA.
a building with a fountain in front
Folsom Cordova Education Center, New Design
Designed the new centralized district administrative headquarters for the Folsom-Cordova USD.
a building with a lot of windows
Ocosta Elementary School, Tsunami Vertical Evacuation Building, Westport, WA
Performance-based design methodologies were implemented to ensure that the structure would be able to resist a Cascadia earthquake while having sufficient capacity to resist subsequent tsunami inundation forces.
a building with a yellow van parked in front of it

New Design

For every new building, our goal is to provide our clients with an efficient design while not compromising quality. One method we have found that fosters this is fast-track project scheduling, which reduces project schedules and saves construction cost. Through structural technologies such as sustainable and performance-based design, Degenkolb can produce a design that is more efficiently constructable while ensuring maximum seismic safety on the building.

All Services

MSIRobot