Hewlett-Packard, Executive Briefing Center
Designed a new Executive Briefing Center, approximately 37,000 square feet with two levels plus a roof penthouse.
a building with a glass window
California Pacific Medical Center, Van Ness and Geary Medical Center
The team scheduled, quantified, analyzed, and documented the design in real time, reducing waste.
a city with tall buildings
Solyndra Manufacturing Facility
In less than 10 months, both the design and construction of the facility were complete.
Solyndra Solar Plant

New Design

For every new building, our goal is to provide our clients with an efficient design while not compromising quality. One method we have found that fosters this is fast-track project scheduling, which reduces project schedules and saves construction cost. Through structural technologies such as sustainable and performance-based design, Degenkolb can produce a design that is more efficiently constructable while ensuring maximum seismic safety on the building.

All Services

MSIRobot