Casa Maravilla, New Design
High-end residential project of approximately 1,200 square meters.
California Pacific Medical Center, Van Ness and Geary Medical Center
The team scheduled, quantified, analyzed, and documented the design in real time, reducing waste.
a city with tall buildings
Mangini Ranch Elementary School, New Design
A new multi-story academic building with five seismically separate structures and a steel special moment frame lateral system at Mangini Ranch Elementary School.

New Design

For every new building, our goal is to provide our clients with an efficient design while not compromising quality. One method we have found that fosters this is fast-track project scheduling, which reduces project schedules and saves construction cost. Through structural technologies such as sustainable and performance-based design, Degenkolb can produce a design that is more efficiently constructable while ensuring maximum seismic safety on the building.

All Services

MSIRobot