Department of Veterans Affairs, Loma Linda Community Based Outpatient Clinics
This facility was delivered as a private-public partnership (P3), a first for the VA.
a building with a fountain in front
UC San Francisco, Joan and Sanford I. Weill Neurosciences Building
Made possible through a landmark gift by the Weill Family Foundation, the UCSF Weill Institute for Neurosciences leverages UCSF’s bench-to-bedside excellence.
UCSF Weill Institute for Neuroscience building
University of California Davis, Bioseed Technology Laboratory
a fire hydrant in front of a building

New Design

For every new building, our goal is to provide our clients with an efficient design while not compromising quality. One method we have found that fosters this is fast-track project scheduling, which reduces project schedules and saves construction cost. Through structural technologies such as sustainable and performance-based design, Degenkolb can produce a design that is more efficiently constructable while ensuring maximum seismic safety on the building.

All Services

MSIRobot