Department of Veterans Affairs, Las Vegas Medical Center
The design of the Center Utility Plant allows the facility to function an additional 10 days on its own without utility resources.
a long shot of a building
UC Santa Cruz, Cowell Student Health Center Expansion
Seismically strengthened and expanded the 42-year-old existing, original two-story reinforced concrete building, using ASCE-41.
UCSC Cowell Student Health Center
Greer Elementary School, Design Build
Phased Design-Build delivery of comprehensive campus-wide upgrade and new classroom buildings, administration, and multi-purpose at Greer Elementary.
aerial view of a city

New Design

For every new building, our goal is to provide our clients with an efficient design while not compromising quality. One method we have found that fosters this is fast-track project scheduling, which reduces project schedules and saves construction cost. Through structural technologies such as sustainable and performance-based design, Degenkolb can produce a design that is more efficiently constructable while ensuring maximum seismic safety on the building.

All Services

MSIRobot