181 Fremont
We worked with steel fabricator/erector, The Herrick Corporation, to provide an array of steel erection engineering services for this 800-foot mixed-use tower.
181 Fremont
Kaiser Permanente, Oakland Main Hospital
The project achieved about $50 million escalation cost savings by using an incremental review process during design.
Kaiser Permanente Oakland Replacement Hospital, Main Hospital
Shoalwater Bay Indian Tribe Tsunami Evacuation Tower, Tokeland, Washington

New Design

For every new building, our goal is to provide our clients with an efficient design while not compromising quality. One method we have found that fosters this is fast-track project scheduling, which reduces project schedules and saves construction cost. Through structural technologies such as sustainable and performance-based design, Degenkolb can produce a design that is more efficiently constructable while ensuring maximum seismic safety on the building.