Department of Veterans Affairs, Las Vegas Medical Center
The design of the Center Utility Plant allows the facility to function an additional 10 days on its own without utility resources.
a long shot of a building
Evergreen Valley College, Library
a building with a white exterior
University of California, Davis, Jan Shrem and Maria Manetti Shrem Museum of Art
Degenkolb peer reviewed a one-story 32,000 square foot art museum building with an extremely complex curving geometry. 
a building with a courtyard

New Design

For every new building, our goal is to provide our clients with an efficient design while not compromising quality. One method we have found that fosters this is fast-track project scheduling, which reduces project schedules and saves construction cost. Through structural technologies such as sustainable and performance-based design, Degenkolb can produce a design that is more efficiently constructable while ensuring maximum seismic safety on the building.

All Services

MSIRobot