181 Fremont
We worked with steel fabricator/erector, The Herrick Corporation, to provide an array of steel erection engineering services for this 800-foot mixed-use tower.
181 Fremont
University of Washington Architecture Hall Renovation
Degenkolb Engineers performed a seismic upgrade and renovation of the historic Architecture Hall at the University of Washington.
a building with a staircase
Ocosta Elementary School, Tsunami Vertical Evacuation Building, Westport, WA
Performance-based design methodologies were implemented to ensure that the structure would be able to resist a Cascadia earthquake while having sufficient capacity to resist subsequent tsunami inundation forces.
a building with a yellow van parked in front of it

New Design

For every new building, our goal is to provide our clients with an efficient design while not compromising quality. One method we have found that fosters this is fast-track project scheduling, which reduces project schedules and saves construction cost. Through structural technologies such as sustainable and performance-based design, Degenkolb can produce a design that is more efficiently constructable while ensuring maximum seismic safety on the building.

All Services

MSIRobot